Much like overhead transmission lines, underground electrical cables and other ancillary facilities can experience problems if they arent properly maintained. The cable is fed from the bottom of the reel so that its curvature is continuous with no reversed bends. Underground cables are usually employed to deliver 3 phase power. Responsibility of costs determining responsibility of costs who pays for what is extremely important. Underground installation of optical fiber cable by pulling. Hands on video training presentation for osp fttx project deployment and activ. Approved code of practice for avoiding underground services and avoid danger from overhead services is adhered to at all times 7. Method statement for excavation and backfilling for underground services. Trenches need to be excavated and access to the construction site has to be cleared for heavy machinery needed for cable transportation and trenching. Understand the essential characteristics and requirements of underground cables. Cardiff road, barry, south glamorgan, cf63 2yl client. Underground cable laying proposal to lay power cable and. Underground installation of optic fiber cable placing.
The insulating material is very sensitive to large voltage changes and cannot be repaired. This method of laying underground cables is simple and cheap and is much favoured in modern practice. Design, installation and protection of underground cables. Underground cable distribution up to and including 33kv infrastructure technical standards page b05. Ppt underground cables powerpoint presentation free to. The c50 cable pusher has been designed to assist the laying of electrical cables or cylindrical elements. Introduction increasingly, utilities, developers and power producers seeking to build new power transmission systems are required to at least consider underground cables as an alternative to overhead lines. If the specifications do not clarify these areas of costs, submit. Magdi elsaadawi requirements of underground cables. One of these is concerned with the laying of the physical network of wires or cables. Main changes with respect to the second edition relate to. Introduction increasingly, utilities, developers and power producers seeking to build new power transmission. Minimum trench width will depend on site conditions and embedment materials. If a power cable and a communication cable are to run parallel the minimum distance between the two, to avoid interference, should.
Underground cables are, of course, meant to be installed or laid under the ground. In the following paper, we would like to suggest some of these areas for your consideration in. Works shall be carried out in compliance with the drawings, project specifications, and materials. The unit has a profiled drive system to grip the cable, with a load applicator of adjustable upper rollers. This third edition cancels and replaces the second edition published in 1997, of which it constitutes a technical revision. Electrical installations of ships and of mobile and fixed offshore units. Description, download installation manual, screwon eye installation manual, download pdf instruction manual, rolly winch user manual, download pdf material safety data sheet, aqualube cable hauling lubricants, download pdf plumett microjetting lube, download pdf plumett jetting lube, download pdf capability statements, clp manufacturing capability statement, download pdf. Electronic blow fibre unit ultimaz e25 for inhouse installation. The purpose of this method is to describe the measures and ways of proper installation of low voltage cables and wires in this project. In order to promote public education and public safety, equal justice for all, a better informed citizenry, the rule of law, world trade and world peace, this legal document is hereby made available on a noncommercial basis, as it is the right of all humans to know and speak the laws that govern them. A guideline for laying of cables and installation of sleeves.
H010052600 innovative solutions for underground cable laying, essen, may 4, 2010. Step 1 dig a trench the first part of the process involves digging a trench to put the wires in. The trench is covered with a layer of fine sand of about 10 cm thickness and the cable is laid over this. Draw in system cable layout methods is widely used for heavily populated areas such as urban cities and towns. Pdf method statement for excavation and backfilling for. The civil works during this time can have considerable consequences for the environment. Underground cable and ducts are part of the underground conduit system. Underground cables have different technical requirements than overhead lines and have different environmental impacts. Figure f2 cable feed into conduit at floor level c from cable reel to cable tray, the cable is fed from the top of the reel to maintain required curvature.
Mar 09, 2018 method statement for laying of low voltage cables and wires. There are three main methods of laying underground cables, which are i direct laying, ii drawin system and iii. Technical specification for underground power cables and. The cable must be provided with suitable mechanical protection to withstand the rough use in laying it. Natural rubber is obtained from milky sap of tropical trees. The above tables do not represent an exhaustive list of underground apparatus. Lightning arrestors are placed close to where the underground cable connects to the overhead line to protect the underground cable from nearby lightning strikes. This is proposed model of underground cable fault distance locator using microcontroller. Jul 01, 20 laying of underground cables the reliability of underground cable network depends to a considerable extent upon proper laying. Specification for installation of underground conduit systems. It does not legally have to be done by an electrician. The drive system is hydraulic, and is powered by a c1203f portable hydraulic power pack. Direct in the ground in trenches underground cables.
The cables to be laid using this method must have the serving of bituminised paper and hessian tape so as to provide protection against corrosion and electrolysis. Powerpoint slide on underground cable laying compiled by manish kumar jha. Download all of craftsmans most popular costbooks for one low price with the craftsman site license. Power grids underground medium voltage prysmian group. The reliability of underground cable network highly depends upon proper laying of cables, quality of cable joints and branch connections etc. Environmental aspects of underground cabling grid configuration.
Telecommunication conduits are made from various materials and buried directly into the soil or encased in concrete. Depending on what area of the country you live in, the trench may need to be a certain depth. Underground fiber laying services underground fibre optic. Direct laying of underground cables this method is the most popular as it is simple and cheap. The materials used in manufacture of cables should be such that there is complete chemical and physical stability throughout. A method for laying underground cable utilizing a plow blade assembly positioned beneath the surface of the ground, including the steps of. It is classified in four parts dc power supply part, cable part,controlling part, display. Pdf underground cable laying proposal to lay power cable. The decision between underground cables and overhead lines comes up at some point during the planning of every new power line.
When groundwater levels are expected to reach above the pipe, the secondary initial backfill should be a continuation of the primary initial backfill in order to provide optimum pipe support. Utilities and local authorities do not own all the apparatus that may be found underground. Table of cable components 12 metallic screens earthing shortcircuit operating conditions 14 grounding methods 14 earth cable protection 15 earthing diagrams 1617 laying methods 1819 cable reels 20 permissible bending radius 20 pulling tensions 20 fastening systems 21 cable system tests 21. Underground power cables and accessories for nominal system voltages of 66kv and 2 kv jts040110. This video presents the fiber optic cable laying on underground application. Here are the basics of laying electrical cables underground. Once or twice a year there are also vetterseminars in english. In this method of laying underground cables, a trench of about 15 metres deep and 45 cm wide is dug. Cfo 301 standard for installing and testing fiber optics management, security or fire alarm systems, or any other communications link. The world leader in the energy and telecom cables and systems industry product finder discover products and solutions. In this method, a trench of about 15 metres deep and 45 cm wide is dug. Both options are never without environmental impacts.
Pdf underground cable laying proposal to lay power. Saw everything that i wanted to see, pompous narration about laying cable around the sf bay. Is a cable is to be designed for use on kv, which insulation would you prefer. Description, download installation manual, screwon eye installation manual, download pdf instruction manual, rolly winch user manual, download pdf certificate of compliance, hydraulic drum jack 3t, download pdf hydraulic drum jack 8t, download pdf drum rollers 1t, download pdf scissor lift 3t, download pdf cable drum caddy 5kg, download pdf material safety data sheet, aqualube cable. Given a new cable installation task, both the departments have their separate speci. Laying electrical cable underground is a project that a lot of people undertake at some point in their lives. Laying uf underground feeder cable directly into the ground. Further, the vertical runs where the cable descends into the ground at the house side. The layout arrangement of the draw in the system is shown in the figure. Method statement risk assessment scottish government. Chapter 7 underground installation of pe piping 267 figure 1 pipe trench note. The 3 main underground cable laying system use in practice. The sand prevents the entry of moisture from the ground and. Under ground cables presention linkedin slideshare.
Technically a possibility exists to operate both cables in one trench but no provisions could be found for laying the power cable and the communication cable together. Pdf new technique to install power cables into ducts. The discussion is focused on transmission cables but also has relevance for distribution cable applications. Underground electric transmission lines introduction this overview contains information about electric transmission lines which are installed underground, rather than overhead on poles or towers. As these cables are not exposed to the air atmosphere, this makes the ug cabling system less. Guide swivels should be used between the cable grip and pulling rope. For higher voltages, 3 cored constructions become too bulky, and hence, even with some limitations we employ single cored cables. Keywords fiber optic cable, underground installation. Apply practices for fault detection and location and for power cables. This is known as direct burial, and if you do this, the uf cable must be at least 24 inches below the surface of the ground, to minimize the chance of the cable being pierced by routine shoveling.
Testing and performance for alldielectric selfsupporting adss fiber optic cable for use on electric utility power lines. This is a film by bell telephone depicting the efforts to waterproof underground cable. There are three main methods of laying underground cables a. Method statement for laying of low voltage cables and wires. In congested areas where excavation is expensive and inconvenient draw in system of laying of underground cables is often adopted. The trench is covered with a layer of fine sand of about 10 cm thickness and the cable is laid over this sand bed. An introduction to underground cable installation placing cables underground has traditionally been seen as a more costly solution than an overhead alternative, however lower cost production methods such as xlpe over lead or oil filled cables, improved technologies and installation methods and increased reliability means the cost differential. Technical specification for underground power cables and accessories for nominal system voltages of 66kv and 2 kv i specificationjts040110 ver 1 joint document between energex and ergon energy. However, the character and extend of ramifications differ extremely. All dielectric self supporting adss fiber optic cable. Carry out jointing and termination of high voltage underground cables. Beyond that, insulation required for the cable is too much. This chapter discusses the different ways of cables installation such as open wire, aerial cable, aboveground conduits, underground ducts and underwater. Appreciate the technical options for selection, laying and operation of power cables.
Technical specification for underground power cables and accessories for nominal system voltages of 66kv and 2 kv page 1 of 24 specificationjts040110 ver 1. Draw in system underground cable laying draw in system cable layout. A cable may have one or more conductor depending upon the type of service. Drum ramp rollers drrd the clp drum ramp roller features the addition of two inline vertical replacement rollers and a rear stabilising bar to keep the drum firmly in place when being spooled out a particular advantage when the drum gets lighter towards the end of the cable. The first semiautomatic cable blowing unit with blowing assistant and electronic blowing data. Description, download installation manual, screwon eye installation manual, download pdf instruction manual, rolly winch user manual, download pdf certificate of compliance, hydraulic drum jack 3t, download pdf hydraulic drum jack 8t, download pdf drum rollers 1t, download pdf scissor lift 3t, download pdf cable drum caddy 5kg, download pdf material safety data sheet, aqualube cable lubricants. Protection of the environment during the works laying the 710mm pipe in craigendoran. Underground power cables high voltage underground cables 2 2 circuits 3000m 3x1x2000mm2 e. Apparatus as claimed in claim 2 including a sand ejector assembly for supplying sand into the channel to enhance the compaction of the soil about the cable. For instance, high pressure fluid and gas filled pipe hpff and hpgf cable types or selfcontained fluid filled scff electrical cable types are prone to developing fluid leaks.
Normally the cables are layout in ducts or pipelines on the ground with certain manholes. Fiber optic cables have provided a more optimal use of available underground conduit space because of its small cable diameter and the much higher. Privately owned pipes and cables exist and their records may not be widely available. The vde 0816 gives the following values, during laying. In areas where the aesthetic and technical above ground considerations are not of priority, such as open country areas, trenching is still an economical and timely method to lay cable.